Modernization of the 20 kV OHL Târgu Ocna – Salina by replacing the insulation systems and rehabilitating the existing infrastructure

For Delgaz Grid, ADREM INVEST, in association with MION Electro Consult and Energofanex, carried out complex works to modernize the 20 kV Târgu Ocna – Salina medium voltage overhead power line, an energy infrastructure in operation since the 1970s. The main objective of the project was to maintain and restore the operating parameters of the line, by replacing the components affected by wear and increasing the level of safety in operation.

Located in a mountainous area with difficult relief and limited access, the line serves a critical infrastructure for the Târgu Ocna area. The complexity of the works has been amplified by the fact that the route of the network, made several decades ago on public land, currently crosses numerous private properties resulting from successive changes in the ownership regime.

Within the project, the existing insulation systems were replaced with modern composite equipment, 375 insulators and 825 tensioning chains were installed. Five new separators were also installed together with the related brackets, contributing to increasing flexibility and safety in the operation of the network.

The works also included the rehabilitation of the support infrastructure, by replacing the pillars that had functionality problems, carrying out repair works on the concrete structures and the anti-corrosion protection of the metal elements. 142 brackets and three lattice pillars were painted, and 180 pillars were reinscribed according to the requirements of the distribution operator.

A special chapter of the project was represented by the special works carried out in the crossing areas. The project team replaced some wooden portal poles with 2xSMT 18-2500 type tubular metal poles for the overcrossing of the DN12A national road and the related diversion of the power line, an intervention considered almost unique at the level of medium voltage networks in the region of Moldova. At the same time, for the crossing of the Slănic River, the existing portal poles were replaced with 2xSC 15015 concrete structures, adapted to the operating conditions and current safety requirements.

In order to improve the access and operation of the facilities, the project also included the relocation of PTA 8 Târgu Ocna to the public domain, by relocating and installing a new transformer substation. Although the initial duration of the contract was 12 months, the implementation of the works required an extended period, with the agreement of the beneficiary, as a result of the changes in the design theme and the limited number of scheduled interruptions available annually.

By completing the investment, Delgaz Grid benefits from a modernized infrastructure, capable of operating in increased conditions of safety and reliability. The works contribute to reducing the risk of damages, increasing continuity in the electricity supply and extending the operating life of a line essential for supplying consumers in the area.

20 kV

Upgraded Line Voltage

375

composite insulators replaced

825

Mounted tensioning chains

11

Medium voltage poles replaced

alt="Instalarea contoarelor inteligente pentru 641.053 de consumatori din rețeaua Rețele Electrice"
Installation of smart meters for 641,053 consumers in the Electricity Networks network
As part of the project implemented for Power Grids, Adrem Invest ensured the installation and commissioning of 641,053 smart meters, contributing to the development of a modern metering and metering data management infrastructure.
alt="Implementarea infrastructurii de contorizare inteligentă pentru 2.7 milioane consumatori"
Implementation of smart metering infrastructure for 2.7 million consumers in the Oltenia Energy Distribution network
Adrem Invest contributed to the modernization of the electricity metering infrastructure for Distribuție Energie Oltenia (DEO), by implementing the installation and integration services of smart meters and developing the infrastructure necessary for the transition from traditional metering to a digital consumption monitoring system. The project, started in 2009, aimed to modernize the metering infrastructure in the Oltenia distribution area, by installing smart meters and managing the operations associated with the existing metering infrastructure.
alt="Modernizarea și digitalizarea rețelei de medie tensiune aferente stației 110/20 kV Năvodari"
Modernization and digitalization of the medium voltage network related to the 110/20 kV Navodari substation
For Reţe Electrice Romania, ADREM carried out the development, modernization and systematization works of the medium voltage network related to the 110/20 kV Năvodari transformer station, in a strategic project financed by the Modernization Fund.
alt="Modernizarea și digitalizarea rețelei de distribuție din comuna Butoiești, județul Mehedinți"
Modernization and digitization of the distribution network in Butoiesti commune, Mehedinti county
ADREM, as consortium leader, contributes to the implementation of one of the most complex projects for the modernization of the electricity distribution infrastructure carried out in Mehedinti County. Carried out for Distribuție Energie Oltenia and financed by non-reimbursable European funds, the project aims to transform a conventional network into a modern, digitized infrastructure ready to meet the current and future requirements of consumers.
alt="sistem de distribuție inteligentă prin digitalizarea și actualizarea bazei de date a activelor din județul Galați"
Creating a smart distribution system by digitizing and updating the database of assets in Galati County
The digital transformation of electricity distribution networks requires the existence of complete databases, updated and correlated with the reality on the ground. In this context, ADREM participated in the implementation of the investment “Realization of a smart distribution system, in a homogeneous area of electricity consumers in the municipality of Galati”, providing specialized services for collecting, verifying and updating the technical data related to the energy infrastructure managed by Distribuție Energie Electrică Romania (DEER).
alt="Modernizarea branșamentelor pentru reducerea consumului propriu tehnologic (CPT)"
Modernization of connections to reduce own technological consumption (CPT) in the municipality of Râmnicu Vâlcea
The reduction of own technological consumption (CPT) and the modernization of the metering infrastructure are important objectives for electricity distribution operators. In this context, ADREM has carried out for Distribuție Energie Oltenia a project to modernize the electrical connections in the municipality of Râmnicu Vâlcea, aimed at increasing the efficiency of the network and improving the operating conditions of the metering groups.