Installation of smart meters for 641,053 consumers in the Electricity Networks network

As part of the project implemented for Power Grids, Adrem Invest ensured the installation and commissioning of 641,053 smart meters, contributing to the development of a modern metering and metering data management infrastructure.

The project aimed to move from traditional metering processes to a digital infrastructure based on Smart Metering technologies, capable of allowing the automatic collection, transmission and efficient management of consumption data.

The activities carried out included installation and replacement works of measuring equipment, configuration and verification of smart meters, their commissioning, as well as integration into the communication infrastructure and data management systems used by the distribution operator.

The implemented solution provides improved visibility on electricity consumption, allows the automation of the index collection process, reduces the need for manual interventions and creates the premises for the development of modern services for end users.

Through the Smart Metering infrastructure implemented, the Power Grids benefit from more accurate and available data in a short period of time, supporting the optimization of operational processes, the rapid identification of abnormal situations in the grid and decision-making based on real information in the field.

The project contributes to the digital transformation of electricity grids and to increasing the level of automation in the energy distribution activity, representing an important step towards more efficient, secure grids more adapted to the current requirements of the energy sector.

641.053

smart meters installed

Smart Metering

Digital metering infrastructure deployed in the distribution network

alt="Instalarea contoarelor inteligente pentru 641.053 de consumatori din rețeaua Rețele Electrice"
Installation of smart meters for 641,053 consumers in the Electricity Networks network
As part of the project implemented for Power Grids, Adrem Invest ensured the installation and commissioning of 641,053 smart meters, contributing to the development of a modern metering and metering data management infrastructure.
alt="Implementarea infrastructurii de contorizare inteligentă pentru 2.7 milioane consumatori"
Implementation of smart metering infrastructure for 2.7 million consumers in the Oltenia Energy Distribution network
Adrem Invest contributed to the modernization of the electricity metering infrastructure for Distribuție Energie Oltenia (DEO), by implementing the installation and integration services of smart meters and developing the infrastructure necessary for the transition from traditional metering to a digital consumption monitoring system. The project, started in 2009, aimed to modernize the metering infrastructure in the Oltenia distribution area, by installing smart meters and managing the operations associated with the existing metering infrastructure.
alt="Modernizarea și digitalizarea rețelei de medie tensiune aferente stației 110/20 kV Năvodari"
Modernization and digitalization of the medium voltage network related to the 110/20 kV Navodari substation
For Reţe Electrice Romania, ADREM carried out the development, modernization and systematization works of the medium voltage network related to the 110/20 kV Năvodari transformer station, in a strategic project financed by the Modernization Fund.
alt="Modernizarea și digitalizarea rețelei de distribuție din comuna Butoiești, județul Mehedinți"
Modernization and digitization of the distribution network in Butoiesti commune, Mehedinti county
ADREM, as consortium leader, contributes to the implementation of one of the most complex projects for the modernization of the electricity distribution infrastructure carried out in Mehedinti County. Carried out for Distribuție Energie Oltenia and financed by non-reimbursable European funds, the project aims to transform a conventional network into a modern, digitized infrastructure ready to meet the current and future requirements of consumers.
alt="sistem de distribuție inteligentă prin digitalizarea și actualizarea bazei de date a activelor din județul Galați"
Creating a smart distribution system by digitizing and updating the database of assets in Galati County
The digital transformation of electricity distribution networks requires the existence of complete databases, updated and correlated with the reality on the ground. In this context, ADREM participated in the implementation of the investment “Realization of a smart distribution system, in a homogeneous area of electricity consumers in the municipality of Galati”, providing specialized services for collecting, verifying and updating the technical data related to the energy infrastructure managed by Distribuție Energie Electrică Romania (DEER).
alt="Modernizarea branșamentelor pentru reducerea consumului propriu tehnologic (CPT)"
Modernization of connections to reduce own technological consumption (CPT) in the municipality of Râmnicu Vâlcea
The reduction of own technological consumption (CPT) and the modernization of the metering infrastructure are important objectives for electricity distribution operators. In this context, ADREM has carried out for Distribuție Energie Oltenia a project to modernize the electrical connections in the municipality of Râmnicu Vâlcea, aimed at increasing the efficiency of the network and improving the operating conditions of the metering groups.