Modernization of the low voltage electricity network PTA 1 Izvoru, Neamt county

For Delgaz Grid, ADREM Invest carried out a complex project to modernize the electricity distribution infrastructure in Izvoru, Ion Creangă commune, Neamt County. The investment aimed to increase the reliability of the network, reduce technical losses and improve the quality of the electricity supply service for consumers in the area.

The project involved both the development of new distribution capacities and the modernization of the existing infrastructure. As part of the works, a new medium voltage overhead power line was built, supported by 11 new poles with cast foundations, as well as the installation of a new overhead transformer substation, sized to meet the current and future consumption requirements of the community.

An important component of the investment consisted in the modernization of the low-voltage network by replacing approximately 6 kilometers of classic twisted-pair conductor conductors. This solution contributes to increasing operational safety, reducing the number of faults and improving the performance of the network in difficult weather conditions. At the same time, 65 new support and extension poles were installed for the low voltage network, strengthening the distribution infrastructure and increasing its resilience.

Within the project, 210 electrical connections were modernized and brought to the property limit, contributing to increasing the safety of the installations and facilitating the access of the distribution operator for operation and maintenance activities. This stage allowed the alignment of the infrastructure to the current technical standards and the improvement of the supply conditions for the consumers served.

The works were carried out in a difficult context, marked by weather conditions specific to the cold season and the restrictions generated by the winter holiday period. For these reasons, the initial execution period of 60 calendar days was extended to 90 days. Despite the challenges encountered, the project was successfully completed, and the modernized infrastructure contributes today to increasing the safety and continuity of electricity supply for the local community.

By implementing this project, Delgaz Grid benefits from a modernized network adapted to current distribution requirements, capable of providing quality services and supporting the future development of the area.

6 km

upgraded twisted-pair conductor JT network

65

new support and stretching poles installed

210

Modernized and relocated connections at the property limit

11 MT poles + 1 new PTA

to increase distribution capacity

alt="Instalarea contoarelor inteligente pentru 641.053 de consumatori din rețeaua Rețele Electrice"
Installation of smart meters for 641,053 consumers in the Electricity Networks network
As part of the project implemented for Power Grids, Adrem Invest ensured the installation and commissioning of 641,053 smart meters, contributing to the development of a modern metering and metering data management infrastructure.
alt="Implementarea infrastructurii de contorizare inteligentă pentru 2.7 milioane consumatori"
Implementation of smart metering infrastructure for 2.7 million consumers in the Oltenia Energy Distribution network
Adrem Invest contributed to the modernization of the electricity metering infrastructure for Distribuție Energie Oltenia (DEO), by implementing the installation and integration services of smart meters and developing the infrastructure necessary for the transition from traditional metering to a digital consumption monitoring system. The project, started in 2009, aimed to modernize the metering infrastructure in the Oltenia distribution area, by installing smart meters and managing the operations associated with the existing metering infrastructure.
alt="Modernizarea și digitalizarea rețelei de medie tensiune aferente stației 110/20 kV Năvodari"
Modernization and digitalization of the medium voltage network related to the 110/20 kV Navodari substation
For Reţe Electrice Romania, ADREM carried out the development, modernization and systematization works of the medium voltage network related to the 110/20 kV Năvodari transformer station, in a strategic project financed by the Modernization Fund.
alt="Modernizarea și digitalizarea rețelei de distribuție din comuna Butoiești, județul Mehedinți"
Modernization and digitization of the distribution network in Butoiesti commune, Mehedinti county
ADREM, as consortium leader, contributes to the implementation of one of the most complex projects for the modernization of the electricity distribution infrastructure carried out in Mehedinti County. Carried out for Distribuție Energie Oltenia and financed by non-reimbursable European funds, the project aims to transform a conventional network into a modern, digitized infrastructure ready to meet the current and future requirements of consumers.
alt="sistem de distribuție inteligentă prin digitalizarea și actualizarea bazei de date a activelor din județul Galați"
Creating a smart distribution system by digitizing and updating the database of assets in Galati County
The digital transformation of electricity distribution networks requires the existence of complete databases, updated and correlated with the reality on the ground. In this context, ADREM participated in the implementation of the investment “Realization of a smart distribution system, in a homogeneous area of electricity consumers in the municipality of Galati”, providing specialized services for collecting, verifying and updating the technical data related to the energy infrastructure managed by Distribuție Energie Electrică Romania (DEER).
alt="Modernizarea branșamentelor pentru reducerea consumului propriu tehnologic (CPT)"
Modernization of connections to reduce own technological consumption (CPT) in the municipality of Râmnicu Vâlcea
The reduction of own technological consumption (CPT) and the modernization of the metering infrastructure are important objectives for electricity distribution operators. In this context, ADREM has carried out for Distribuție Energie Oltenia a project to modernize the electrical connections in the municipality of Râmnicu Vâlcea, aimed at increasing the efficiency of the network and improving the operating conditions of the metering groups.