Modernization of 20 kV power lines by installing insulating sheaths in the Caracal, Scornicești and Corabia area

For Distribuție Energie Oltenia, ADREM carried out modernization works on medium-voltage overhead power lines in Olt County, by installing insulating sheaths on the conductors of the 20 kV networks. The main objective of the project was to increase the reliability of the distribution infrastructure and reduce the number of incidents that can lead to interruptions in the electricity supply.

The interventions were carried out on several medium voltage lines in the Caracal, Scornicești and Corabia areas, including on the routes of the 20 kV Caracal – Plăviceni Station, the 20 kV Grădiște – SIUHE Slătioara OHL, the 20 kV Corabia – TCH Izbiceni OHL, the 20 kV Corabia – Irrigation 6 OHL and the 20 kV Corabia – Corabia City OHL.

The implemented solution consisted of installing insulating sheaths in the insulator area, both on the poles equipped with concrete brackets and on those with metal brackets. These equipment have the role of additionally insulating the electrical conductors and preventing the occurrence of defects caused by birds, vegetation or other foreign bodies that can accidentally come into contact with the live elements. By reducing the number of short circuits and rapid automatic restarts (RAR), the distribution operator benefits from a significant increase in continuity in the supply to consumers.

The execution of the works was carried out within a strict schedule, in order to comply with the performance indicators established by ANRE regarding the electricity distribution service. In order to limit the duration of the interruptions necessary for the interventions, the project mobilized approximately 20 electricians daily, including specialized personnel from Dolj and Teleorman counties.

One of the major challenges of the project was the difficult access to the sites. Most of the lines crossed farmland under operation, and access by machinery was not possible in many areas. The intervention teams manually transported the equipment, materials and means of protection over considerable distances, carrying out the activities in difficult terrain and operating conditions.

By completing the works, Distribuție Energie Oltenia benefits from a safer and more reliable medium voltage infrastructure, with a reduced risk of damage and with an increased capacity to ensure the continuity of supply for consumers in Olt County.

5TH GRADE

20 kV modernized in Olt County

20

specialists/day mobilized in the field

3

targeted operational areas: Caracal, Scornicești and Corabia

100%

Additional protection in critical areas by installing insulating sheaths

alt="Instalarea contoarelor inteligente pentru 641.053 de consumatori din rețeaua Rețele Electrice"
Installation of smart meters for 641,053 consumers in the Electricity Networks network
As part of the project implemented for Power Grids, Adrem Invest ensured the installation and commissioning of 641,053 smart meters, contributing to the development of a modern metering and metering data management infrastructure.
alt="Implementarea infrastructurii de contorizare inteligentă pentru 2.7 milioane consumatori"
Implementation of smart metering infrastructure for 2.7 million consumers in the Oltenia Energy Distribution network
Adrem Invest contributed to the modernization of the electricity metering infrastructure for Distribuție Energie Oltenia (DEO), by implementing the installation and integration services of smart meters and developing the infrastructure necessary for the transition from traditional metering to a digital consumption monitoring system. The project, started in 2009, aimed to modernize the metering infrastructure in the Oltenia distribution area, by installing smart meters and managing the operations associated with the existing metering infrastructure.
alt="Modernizarea și digitalizarea rețelei de medie tensiune aferente stației 110/20 kV Năvodari"
Modernization and digitalization of the medium voltage network related to the 110/20 kV Navodari substation
For Reţe Electrice Romania, ADREM carried out the development, modernization and systematization works of the medium voltage network related to the 110/20 kV Năvodari transformer station, in a strategic project financed by the Modernization Fund.
alt="Modernizarea și digitalizarea rețelei de distribuție din comuna Butoiești, județul Mehedinți"
Modernization and digitization of the distribution network in Butoiesti commune, Mehedinti county
ADREM, as consortium leader, contributes to the implementation of one of the most complex projects for the modernization of the electricity distribution infrastructure carried out in Mehedinti County. Carried out for Distribuție Energie Oltenia and financed by non-reimbursable European funds, the project aims to transform a conventional network into a modern, digitized infrastructure ready to meet the current and future requirements of consumers.
alt="sistem de distribuție inteligentă prin digitalizarea și actualizarea bazei de date a activelor din județul Galați"
Creating a smart distribution system by digitizing and updating the database of assets in Galati County
The digital transformation of electricity distribution networks requires the existence of complete databases, updated and correlated with the reality on the ground. In this context, ADREM participated in the implementation of the investment “Realization of a smart distribution system, in a homogeneous area of electricity consumers in the municipality of Galati”, providing specialized services for collecting, verifying and updating the technical data related to the energy infrastructure managed by Distribuție Energie Electrică Romania (DEER).
alt="Modernizarea branșamentelor pentru reducerea consumului propriu tehnologic (CPT)"
Modernization of connections to reduce own technological consumption (CPT) in the municipality of Râmnicu Vâlcea
The reduction of own technological consumption (CPT) and the modernization of the metering infrastructure are important objectives for electricity distribution operators. In this context, ADREM has carried out for Distribuție Energie Oltenia a project to modernize the electrical connections in the municipality of Râmnicu Vâlcea, aimed at increasing the efficiency of the network and improving the operating conditions of the metering groups.