Projects

Over 30 years of experience in energy transformed into concrete projects for companies and communities across the country. From SCADA systems and automation, to renewable energy and transportation infrastructure, we deliver sustainable solutions that make a difference.

alt="Instalarea contoarelor inteligente pentru 641.053 de consumatori din rețeaua Rețele Electrice"
Installation of smart meters for 641,053 consumers in the Electricity Networks network
As part of the project implemented for Power Grids, Adrem Invest ensured the installation and commissioning of 641,053 smart meters, contributing to the development of a modern metering and metering data management infrastructure.
alt="Implementarea infrastructurii de contorizare inteligentă pentru 2.7 milioane consumatori"
Implementation of smart metering infrastructure for 2.7 million consumers in the Oltenia Energy Distribution network
Adrem Invest contributed to the modernization of the electricity metering infrastructure for Distribuție Energie Oltenia (DEO), by implementing the installation and integration services of smart meters and developing the infrastructure necessary for the transition from traditional metering to a digital consumption monitoring system. The project, started in 2009, aimed to modernize the metering infrastructure in the Oltenia distribution area, by installing smart meters and managing the operations associated with the existing metering infrastructure.
alt="Modernizarea și digitalizarea rețelei de medie tensiune aferente stației 110/20 kV Năvodari"
Modernization and digitalization of the medium voltage network related to the 110/20 kV Navodari substation
For Reţe Electrice Romania, ADREM carried out the development, modernization and systematization works of the medium voltage network related to the 110/20 kV Năvodari transformer station, in a strategic project financed by the Modernization Fund.
alt="Modernizarea și digitalizarea rețelei de distribuție din comuna Butoiești, județul Mehedinți"
Modernization and digitization of the distribution network in Butoiesti commune, Mehedinti county
ADREM, as consortium leader, contributes to the implementation of one of the most complex projects for the modernization of the electricity distribution infrastructure carried out in Mehedinti County. Carried out for Distribuție Energie Oltenia and financed by non-reimbursable European funds, the project aims to transform a conventional network into a modern, digitized infrastructure ready to meet the current and future requirements of consumers.
alt="sistem de distribuție inteligentă prin digitalizarea și actualizarea bazei de date a activelor din județul Galați"
Creating a smart distribution system by digitizing and updating the database of assets in Galati County
The digital transformation of electricity distribution networks requires the existence of complete databases, updated and correlated with the reality on the ground. In this context, ADREM participated in the implementation of the investment “Realization of a smart distribution system, in a homogeneous area of electricity consumers in the municipality of Galati”, providing specialized services for collecting, verifying and updating the technical data related to the energy infrastructure managed by Distribuție Energie Electrică Romania (DEER).
alt="Modernizarea branșamentelor pentru reducerea consumului propriu tehnologic (CPT)"
Modernization of connections to reduce own technological consumption (CPT) in the municipality of Râmnicu Vâlcea
The reduction of own technological consumption (CPT) and the modernization of the metering infrastructure are important objectives for electricity distribution operators. In this context, ADREM has carried out for Distribuție Energie Oltenia a project to modernize the electrical connections in the municipality of Râmnicu Vâlcea, aimed at increasing the efficiency of the network and improving the operating conditions of the metering groups.
alt="Modernizarea stației de transformare 110/20 kV Măgura, Focșani"
Modernization of the 110/20 kV transformer station Magura, Focșani
The 110/20 kV Măgura transformer station is one of the important energy nodes for supplying consumers in the north-eastern area of Focșani. In operation since 1976, the substation serves household, commercial and industrial consumers through the 20 kV and 0.4 kV distribution networks, playing an essential role in the functioning of the local energy infrastructure.
alt="Modernizarea rețelei electrice de joasă tensiune PTA 1 Izvoru, județul Neamț"
Modernization of the low voltage electricity network PTA 1 Izvoru, Neamt county
For Delgaz Grid, ADREM Invest carried out a complex project to modernize the electricity distribution infrastructure in Izvoru, Ion Creangă commune, Neamt County. The investment aimed to increase the reliability of the network, reduce technical losses and improve the quality of the electricity supply service for consumers in the area.
alt="Întărirea rețelei electrice pentru alimentarea Spitalului Orășenesc Dăbuleni"
Strengthening the electrical network for supplying the Dăbuleni City Hospital
Ensuring a safe and continuous supply of electricity for medical infrastructures is a strategic priority for distribution operators. In this context, ADREM carried out for Distribuție Energie Oltenia the design and execution works necessary to strengthen the electricity network in the municipality of Dăbuleni, in order to connect and supply the Dăbuleni City Hospital through a new transformer substation.
alt="Modernizarea liniilor electrice de 20 kV prin instalarea tecilor electroizolante în zona Caracal, Scornicești și Corabia"
Modernization of 20 kV power lines by installing insulating sheaths in the Caracal, Scornicești and Corabia area
For Distribuție Energie Oltenia, ADREM carried out modernization works on medium-voltage overhead power lines in Olt County, by installing insulating sheaths on the conductors of the 20 kV networks. The main objective of the project was to increase the reliability of the distribution infrastructure and reduce the number of incidents that can lead to interruptions in the electricity supply.
alt="Colectare date GIS pentru rețelele de joasă tensiune din județul Mehedinți"
GIS data collection for low voltage networks in Mehedinti County
The digitization of the energy infrastructure and the development of geospatial databases are essential elements for the efficient management of modern electricity distribution networks. In this context, ADREM has carried out for Distribuție Energie Oltenia (DEO) an extensive project for the inventory and collection of GIS data for the low voltage networks in Mehedinti County.
alt="Servicii de mentenanță pentru rețeaua de distribuție a energiei electrice"
Maintenance services for the electricity distribution network managed by Distribuție Energie Oltenia
Since 2011, ADREM has been providing maintenance services for the electricity distribution infrastructure managed by CEZ Distributie, contributing to maintaining the safety, continuity and operational performance of the medium and low voltage networks. The project includes both planned maintenance works and corrective interventions necessary to remedy the faults and restore the normal operation of the installations.
alt="Instalare contoarelor inteligente pentru 580.000 de consumatori din rețeaua Delgaz Grid"
Installation of smart meters for 580,000 consumers in the Delgaz Grid network
The digitization of electricity distribution infrastructure is one of the essential steps in the development of smart grids and in increasing energy efficiency. In this context, ADREM participated, in partnership with Enel Distribuzione Italia, in the implementation of a large-scale project aimed at replacing conventional meters and installing smart meters for 250,000 consumers served by E.ON Distribuție Moldova.
alt="Furnizarea serviciilor de administrare a grupurilor de măsură pentru Distribuție Oltenia"
Provision of metering group management services for Oltenia Distribution
Since 2009, ADREM has been providing management and maintenance services for metering groups for CEZ Distributie, contributing to the efficient functioning of the electricity metering infrastructure in the Oltenia region. Carried out over 15 years, the project represents one of the most important collaborations in the field of operational services dedicated to electricity distribution.
alt="Modernizarea LEA 20 kV Târgu Ocna"
Modernization of the 20 kV OHL Târgu Ocna – Salina by replacing the insulation systems and rehabilitating the existing infrastructure
For Delgaz Grid, ADREM INVEST, in association with MION Electro Consult and Energofanex, carried out complex works to modernize the 20 kV Târgu Ocna – Salina medium voltage overhead power line, an energy infrastructure in operation since the 1970s. The main objective of the project was to maintain and restore the operating parameters of the line, by replacing the components affected by wear and increasing the level of safety in operation.
alt="Modernizarea branșamentelor PTA 1 Celei și preluarea consumatorilor în PTAB Celei"
Modernization of the PTA 1 Celle connections and the takeover of consumers in the PTAB Celle
The project carried out for Distribuție Energie Oltenia aimed at modernizing the electricity distribution infrastructure in the Cea district, Corabia city, an area of special importance from a historical and cultural point of view, located in the vicinity of the archaeological site “Sucidava Roman Fortress”.